
Attaching an Expansion Tier to the NGC Instrument
Installation Guide | 4 9
10. Insert the other connector into the lower tier’s connector port.
11. Place the top, with the buffer tray, on top of the NGC instrument and place the
buffer bottles into the buffer tray.
12. Insert tubing lines into the sample and buffer bottles.
Commentaires sur ces manuels